Imaging Equipment Specification Version 2.0
The Version 2.0 ENERGY STAR specification for Imaging Equipment has been finalized. Materials related to this revision process are provided below. Partners and other interested parties with questions or concerns regarding these materials or the revision process can contact Christopher Kent, EPA, at kent.christopher@epa.gov. To be added to the contact list, stakeholders are encouraged to send their information to imagingequipment@energystar.gov.
External Power Supply Requirement Update — October 31, 2014
EPA has updated relevant ENERGY STAR electronics product specifications to reflect that the Single- and Multiple-voltage EPSs shall meet the Level V or higher performance requirements under the International Efficiency Marking Protocol. This update does not affect currently certified products but rather allows products with a level VI EPS to be certified as ENERGY STAR.
ITI-JEITA-JBMIA-EPA Follow-up Teleconference - October 15, 2014
On October 15, 2014, the US Environmental Protection Agency (EPA), Information Technology Industry Council (ITI), Japan Electronics and Information Technology Industries Association (JEITA), Japan Business Machine Industry Association (JBMIA) held a follow-up teleconference to discuss progress on the integrity of the ENERGY STAR imaging equipment qualified product database and recent developments. Presentation materials from the teleconference are available for download below.
- ITI-JEITA-JBMIA-EPA PowerPoint (PDF, 618 KB)
- Certified Imaging Equipment (OFFICEDOCUMENT, 944 KB)
Inclusion of Large Format High Performance Ink Jet in Version 2.0 ENERGY STAR Specification for Imaging Equipment - September 5, 2014
- Imaging Lg Format HPIJ Inclusion Cover Letter (Sep-2014) (PDF, 27 KB)
- Version 2.0 Imaging Equipment Program Requirements Sep-2014 (PDF, 1.2 MB)
ITI-JEITA-JBMIA-EPA Workshop on Improving Data for Imaging Equipment - July 9, 2014
On July 9, 2014 the US Environmental Protection Agency (EPA), Information Technology Industry Council (ITI), Japan Electronics and Information Technology Industries Association (JEITA), Japan Business Machine Industry Association (JBMIA), and ENERGY STAR® Certification Bodies Keystone Certifications and Met Labs held a workshop to work collaboratively on methods for ensuring the integrity of the ENERGY STAR imaging equipment qualified product database. Ease of use by various stakeholders, particularly customers was also a priority. Presentations and notes from the workshop are available for download below.
- EPA Presentation (PDF, 294 KB)
- JEITA-JBMIA Presentation Data Issues (PDF, 190 KB)
- JEITA-JBMIA Presentation Dataset Creation Proposal (PDF, 1.1 MB)
- JEITA-JBMIA Presentation Future Specification Considerations (PDF, 916 KB)
- Workshop Summary and Next Steps (PDF, 105 KB)
Final Version 2.0 Program Requirement Clarifications - June 26, 2013
Based on stakeholder questions, EPA and DOE have made several updates to both the specification and the test method to clarify the intended requirements. The clarified program requirements are linked below. None of these clarifications will have an impact on previously certified products.
- Final Version 2.0 Imaging Equipment Clarification Memo Jun-2013 (PDF, 40 KB)
- Final Version 2.0 Imaging Equipment Program Requirements Jun-2013 (PDF, 521 KB)
Final Version 2.0 Specification - April 1, 2013
EPA released the Final Version 2.0 ENERGY STAR Program Requirements for Imaging Equipment on April 1. Manufacturers may elect to have their Certification Body (CB) certify their eligible products to the Version 2.0 requirements from now on. The program requirements, including the specification, and additional information are available through the links below.
- Final Version 2.0 Imaging Equipment Cover Memo (PDF, 51 KB)
- Final Version 2.0 Imaging Equipment Program Requirements (PDF, 929 KB)
- Version 2.0 Imaging Equipment Final Draft Specification Comment Summary (PDF, 82 KB)
- Version 2.0 Imaging Equipment QPX Draft Data Requirements Comment Summary (PDF, 93 KB)
- Version 1.2 - Version 2.0 Imaging Equipment Test Method Comparison (PDF, 537 KB)
Stakeholder Comments on ENERGY STAR Version 2.0 Imaging Equipment Final Draft Modifications - March 1, 2013
- EFI Comments (PDF, 109 KB)
- JBMIA-JEITA Comments (PDF, 96 KB)
- RICOH Comments (PDF, 126 KB)
Webinar to Discuss Modifications to Imaging Equipment Specification - February 22, 2013
The U.S. Environmental Protection Agency (EPA) hosted a stakeholder webinar to present details on additional modifications to the Version 2.0 ENERGY STAR specification for Imaging Equipment. These modifications were discussed in a letter to stakeholders distributed on February 15 and concerned Digital Front Ends (DFEs) and an adder for A3-capable TEC products.
Proposed Modifications to the Version 2.0 Specification for Imaging Equipment - February 15, 2013
The U.S. Environmental Protection Agency (EPA) released a letter with additional proposed changes to the Version 2.0 specification based on comments on the Final Draft. Prior to finalizing the specification, EPA is seeking stakeholder input on these changes and has scheduled a webinar on February 22, 2013, from 1 pm to 2:30 pm Eastern Time.
Stakeholder Comments on ENERGY STAR Version 2.0 Imaging Equipment Final Draft - January 3, 2013
- Canon Final Draft Comments (PDF, 79 KB)
- EFI Final Draft Comments (PDF, 133 KB)
- Fujitsu Final Draft Comments (PDF, 22 KB)
- ITI and JEITA Final Draft Comments (PDF, 240 KB)
- JBMIA Final Draft Comments (PDF, 160 KB)
- JEITA and JBMIA Final Draft Comments (PDF, 103 KB)
- JEITA Printer Committee Comments (PDF, 179 KB)
- JEITA Scanner Committee Comments (PDF, 103 KB)
- Lexmark Final Draft Comments (PDF, 99 KB)
- Ricoh Final Draft Comments (PDF, 142 KB)
- Ricoh Additional Final Draft Comments (EXCEL, 29 KB)
Final Draft Version 2.0 Webinar - December 18, 2012
EPA hosted a webinar to discuss stakeholder comments on the Final Draft specification, published on December 5, 2012.
Final Draft Version 2.0 Specification - December 5, 2012
The U.S. Environmental Protection Agency (EPA) released the Final Draft Version 2.0 ENERGY STAR Specification for Imaging Equipment on December 5. The draft and associated documents can be accessed through the links below. Stakeholders are invited to review these documents and submit comments to EPA via email to imagingequipment@energystar.gov by Friday, December 28, 2012.
- Final Draft Version 2.0 Imaging Equipment Cover Letter (PDF, 56 KB)
- Final Draft Version 2.0 Imaging Equipment Specification (PDF, 272 KB)
- Draft Version 2.0 Imaging Equipment Partner Commitments (PDF, 48 KB)
- Draft 2 Version 2.0 Imaging Equipment Specification Comment Summary (PDF, 110 KB)
- Final Draft Version 2.0 Imaging Equipment Dataset (EXCEL, 783 KB)
Draft 2 Version 2.0 Webinar - August 15, 2012
EPA hosted a webinar to discuss stakeholder comments on the Draft 2 Version 2.0 specification, published on June 29, 2012.
- ENERGY STAR Imaging Equipment Draft 2 Version 2.0 Specification Presentation (PDF, 798 KB)
- Draft 2 Version 2.0 TEC Qualification Rates (PDF, 14 KB)
Stakeholder Comments on Draft 2 Version 2.0 ENERGY STAR Imaging Equipment Specification and Final Version 2.0 Test Method
- Applus Final Test Method Comments (PDF, 46 KB)
- Bureau Veritas Final Test Method Comments (PDF, 133 KB)
- Canon Draft 2 Comments (PDF, 113 KB)
- EFI Draft 2 Comments (PDF, 81 KB)
- E-ImageData Draft 2 Comments (PDF, 34 KB)
- Fujitsu Draft 2 Comments (PDF, 58 KB)
- ITI Draft 2 Comments (PDF, 193 KB)
- JBMIA Draft 2 Comments (PDF, 697 KB)
- JEITA Printer Energy-saving Working Group Draft 2 Comments (PDF, 112 KB)
- JEITA Image Scanner Committee Draft 2 Comments (PDF, 117 KB)
- Kodak Draft 2 Comments (PDF, 62 KB)
- Kyocera Draft 2 Comments (PDF, 314 KB)
- Lexmark Draft 2 Comments (PDF, 119 KB)
- Neopost Draft 2 Comments (PDF, 74 KB)
- Oce Technologies Draft 2 Comments (PDF, 28 KB)
- Ricoh Draft 2 Comments (PDF, 187 KB)
- The Coalition for Government Procurement Draft 2 Comments (PDF, 115 KB)
- Xerox Draft 2 Comments (PDF, 172 KB)
Draft 2 Version 2.0 Specification - June 29, 2012
The U.S. Environmental Protection Agency (EPA) released the Draft 2 Version 2.0 ENERGY STAR Specification for Imaging Equipment on June 29. The draft and associated documents can be accessed through the links below. Stakeholders are invited to review these documents and submit comments to EPA via email to imagingequipment@energystar.gov by Monday, July 30, 2012.
EPA will host a webinar on Wednesday, August 15, 2012, at 11 AM Eastern Time. EPA will present details of the revisions made in the Draft 2 specification and the data analysis performed to date, as well as address stakeholder questions and concerns regarding the proposed changes. If you wish to attend this meeting, please RSVP to imagingequipment@energystar.gov no later than August 6, 2012.
- Draft 1 Version 2.0 Imaging Equipment Specification Comment Response (PDF, 86 KB)
- Draft 2 Version 2.0 Imaging Equipment Cover Memo (PDF, 54 KB)
- Draft 2 Version 2.0 Imaging Equipment Dataset (OFFICEDOCUMENT, 525 KB)
- Draft 2 Version 2.0 Imaging Equipment Specification (PDF, 315 KB)
- Draft Final Version 2.0 Imaging Equipment Test Method Comment Response (PDF, 182 KB)
- Draft Version 2.0 Imaging Equipment Partner Commitments (PDF, 51 KB)
- Final Version 2.0 Imaging Equipment Test Method (PDF, 553 KB)
- Final Version 2.0 Imaging Equipment Test Reporting Template (OFFICEDOCUMENT, 39 KB)
Stakeholder Comments on Draft 1 Version 2.0 ENERGY STAR Imaging Equipment Specification
- EFI Draft 1 Comments (PDF, 76 KB)
- Epson Draft 1 Comments (PDF, 12 KB)
- European Commission Draft 1 Comments (PDF, 81 KB)
- Fujitsu Draft 1 Comments (PDF, 56 KB)
- HP Draft 1 Comments (PDF, 126 KB)
- ITI Draft 1 Comments (PDF, 105 KB)
- JBMIA Draft 1 Comments (PDF, 55 KB)
- JEITA Draft 1 Comments (PDF, 69 KB)
- JEITA Image Scanner Committee Draft 1 Comments (PDF, 141 KB)
- Kodak Draft 1 Comments (PDF, 52 KB)
- Lexmark Draft 1 Comments (PDF, 115 KB)
- Panasonic Draft 1 Comments (PDF, 25 KB)
- RICOH Draft 1 Comments (PDF, 113 KB)
- Xerox Draft 1 Comments (PDF, 314 KB)
Draft 1 Version 2.0 Specification In-person Stakeholder Meeting - March 7, 2012
EPA hosted an in-person stakeholder meeting to discuss stakeholder comments on the Draft 1 Version 2.0 specification published on February 10, 2012.
- ENERGY STAR Imaging Equipment Draft 1 Version 2.0 Specification Presentation (PDF, 4.2 MB)
- EPA Action Items Following the Meeting (PDF, 25 KB)
- European Union Imaging Equipment Developments (PDF, 345 KB)
Draft Final Test Method - February 24, 2012
The U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) have revised the Draft 2 test method as part of the ENERGY STAR imaging equipment specification revision and seek your additional comments on Draft Final. The development of this draft final test method was a joint effort between EPA and DOE conducted in response to comments received during and after the distribution of the draft test method on November 9, 2011 and an online meeting on December 8, 2011. Please send all comments and supporting information to imagingequipment@energystar.gov by Monday, March 26, 2012.
- ENERGY STAR Imaging Equipment Version 2.0 Draft Final Test Method Cover Memo (PDF, 54 KB)
- ENERGY STAR Imaging Equipment Version 2.0 Draft Final Test Method (PDF, 266 KB)
- ENERGY STAR Imaging Equipment Version 2.0 Draft 2 Stakeholder Comment Summary (PDF, 157 KB)
- ENERGY STAR Imaging Equipment Version 2.0 Test Reporting Template (EXCEL, 77 KB)
Draft 1 Version 2.0 Specification - February 10, 2012
The U.S. Environmental Protection Agency (EPA) has developed Draft 1 of the Version 2.0 specification, and supporting documents. EPA welcomes written comment from stakeholders on Draft 1 Version 2.0 specification, DFE supporting document, and OM Analysis supporting document. Please send all comments and supporting information to imagingequipment@energystar.gov by Thursday, March 1, 2012.
EPA will also host an in-person stakeholder meeting on Wednesday, March 7, 2012, at 10:00AM Eastern Time in Washington, DC, to present details on the revisions made in the Draft 1 Version 2.0 ENERGY STAR Imaging Equipment specification and the data analysis performed to date. Stakeholder questions and concerns regarding the proposed changes will be addressed. Please RSVP to imagingequipment@energystar.gov by Monday, March 5, 2012, to receive call-in information.
- ENERGY STAR Imaging Equipment Draft 1 Version 2.0 Specification Cover Memo (PDF, 49 KB)
- ENERGY STAR Imaging Equipment Draft 1 Version 2.0 Specification (PDF, 168 KB)
- ENERGY STAR Imaging Equipment Draft 1 Version 2.0 OM Analysis Supporting Document (PDF, 154 KB)
- ENERGY STAR Imaging Equipment Draft 1 Version 2.0 DFE Supporting Document (PDF, 69 KB)
- ENERGY STAR Imaging Equipment Draft 1 Version 2.0 Dataset (EXCEL, 1.1 MB)
Draft 2 Test Method Webinar - December 8, 2011
EPA hosted a webinar to discuss stakeholder comments on the Draft 2 Test Method published on November 9, 2011, and resolve any concerns prior to finalization.
- Test Method Draft 2 Webinar Presentation (PDF, 200 KB)
Stakeholder Comments on ENERGY STAR Version 2.0 Imaging Equipment Draft 2 Test Method - December 6, 2011
- Canon Draft 2 Test Method Comments (PDF, 57 KB)
- European Commission Draft 2 Test Method Comments (PDF, 50 KB)
- Fujitsu Draft 2 Test Method Comments (PDF, 22 KB)
- JBMIA Draft 2 Test Method Comments (PDF, 33 KB)
- JEITA Draft 2 Test Method Comments (PDF, 11 KB)
- Lexmark Draft 2 Test Method Comments (PDF, 459 KB)
- Oce Draft 2 Test Method Comments (PDF, 32 KB)
- RICOH Draft 2 Test Method Comments (PDF, 18 KB)
- Xerox Draft 2 Test Method Comments (PDF, 222 KB)
Draft 2 Test Method - November 9, 2011
The U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) have revised the Draft 1 test method as part of the ENERGY STAR imaging equipment specification revision and seek your additional comments on Draft 2. The development of the Draft 2 test method was a joint effort between EPA and DOE conducted in response to comments received during and after the distribution of the Draft 1 test method on July 8 and an online meeting on August 4. Please send all comments and supporting information to imagingequipment@energystar.gov by Wednesday, November 30, 2011.
EPA will also host an online stakeholder meeting on Thursday, December 8, 2011, to discuss the proposed approach to the Version 2.0 test method and receive stakeholders' comments. Please RSVP to imagingequipment@energystar.gov by Tuesday, December 6, 2011, to receive call-in information.
- ENERGY STAR Imaging Equipment Version 2.0 Draft 2 Test Method Cover Memo (PDF, 57 KB)
- ENERGY STAR Imaging Equipment Version 2.0 Draft 2 Test Method (PDF, 350 KB)
Test Method Webinar - August 4, 2011
EPA hosted a webinar to discuss stakeholder comments on the draft test method published on July 8 and resolve any concerns prior to finalization.
- Test Method Webinar Presentation (PDF, 1.6 MB)
Stakeholder Comments on ENERGY STAR Version 2.0 Imaging Equipment Draft Test Method - July 29, 2011
- Canon Draft Test Method Comments (PDF, 98 KB)
- Conexant Draft Test Method Comments (PDF, 48 KB)
- EFI Draft Test Method Comments (PDF, 86 KB)
- Epson Draft Test Method Comments (PDF, 19 KB)
- European Commission Draft Test Method Comments (PDF, 55 KB)
- HP Draft Test Method Comments (PDF, 88 KB)
- JBMIA Draft Test Method Comments (PDF, 108 KB)
- JEITA Draft Test Method Comments (PDF, 40 KB)
- Kodak Draft Test Method Comments (PDF, 36 KB)
- Lexmark Draft Test Method Comments (PDF, 78 KB)
- Oce Draft Test Method Comments (PDF, 27 KB)
- Oki Data Americas Draft Test Method Comments (PDF, 15 KB)
- TUV SUD America Draft Test Method Comments (PDF, 63 KB)
Draft 1 Test Method - July 8, 2011
The U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) have developed a revised test method. EPA welcomes written comment from stakeholders on the modifications to the Draft 1 test method and the proposed approach to functional adders. To aid the process of setting specification levels, EPA also welcomes information on any non-ENERGY STAR qualified models from imaging equipment partners. Please send all comments and supporting information to imagingequipment@energystar.gov by Friday, July 29, 2011.
EPA will also host an online stakeholder meeting on Thursday, August 4, 2011, to discuss the proposed approach to the Version 2.0 test method and receive stakeholders' comments. Please RSVP to imagingequipment@energystar.gov by Monday, August 1, 2011, to receive call-in information.
- ENERGY STAR Imaging Equipment Version 2.0 Draft 1 Test Method Cover Memo (PDF, 95 KB)
- ENERGY STAR Imaging Equipment Version 2.0 Draft 1 Test Method (PDF, 300 KB)
- ENERGY STAR Imaging Equipment Specification Non-Qualified Data Form (EXCEL, 209 KB)
Kickoff Webinar - April 13, 2011
EPA hosted a webinar to discuss stakeholder comments on the discussion document published in March 2011.
- ENERGY STAR Imaging Equipment Kickoff Webinar Presentation (PDF, 1.5 MB)
- Summary of Stakeholder Comments and EPA Responses (PDF, 47 KB)
Stakeholder Comments on ENERGY STAR Version 2.0 Discussion Document Imaging Equipment Specification:
- EFI Discussion Document Comments (PDF, 97 KB)
- Epson Discussion Document Comments (PDF, 20 KB)
- European Commission Discussion Document Comments (PDF, 77 KB)
- JBMIA Discussion Document Comments (PDF, 341 KB)
- Lexmark Discussion Document Comments (PDF, 65 KB)
- Oki Data Corporation Discussion Document Comments (PDF, 50 KB)
- Xerox Discussion Document Comments (PDF, 59 KB)
Version 2.0 Discussion Document - March 11, 2011
The U.S. Environmental Protection Agency (EPA) and the European Commission are pleased to announce the revision of the ENERGY STAR Imaging Equipment product specification. Attached for your review and comment are a cover memo and discussion documents. EPA welcomes written comment on the issues presented in the discussion documents through Friday, April 1, 2011. Please send all comments and supporting information to imagingequipment@energystar.gov.
To assist EPA in determining ENERGY STAR performance levels, manufacturers are invited to submit product information on non-qualified imaging equipment models using the data template attached with this letter. If you wish to submit non-qualified product performance data, please send completed data forms to imagingequipment@energystar.gov by Friday, April 1, 2011.
EPA will also hold an online stakeholder meeting on Wednesday, April 13, 2011. Please RSVP to imagingequipment@energystar.gov by Tuesday, April 12, 2011, to receive call-in information.
- ENERGY STAR Imaging Equipment Specification Revision Cover Letter (PDF, 51 KB)
- ENERGY STAR Imaging Equipment Specification Revision Discussion Document (PDF, 343 KB)
- ENERGY STAR Imaging Equipment Specification Revision Discussion Document Issues (PDF, 48 KB)
- ENERGY STAR Imaging Equipment Specification Non-Qualified Data Form (EXCEL, 205 KB)