Access to ENERGY STAR
API, Data Set or  Excel File
 

Find and Compare

  • Together we can create a healthier planet for all of us.

    LEARN MORE
    Tip Image
Electric Vehicle Chargers DC (Commercial) Header Image

ENERGY STAR Certified
Electric Vehicle Chargers DC (Commercial)

Visit the  Electric Vehicle Chargers DC (Commercial) page for usage tips and buying guidelines.

Hyperian - CS-240-D200S1-1

Description

  • Type Field details:
    DC-output (AC-input)
  • Rated Input Voltage (V) AC-Input Field details:
    480.0
  • DC-input or AC-input Field details:
    AC-input
  • ENERGY STAR Partner Field details:
    Hyperian Energy Inc.
  • Maximum Nameplate Output Current (A) AC-Input Field details:
    307.0
  • Output Cord Length (ft.) Field details:
    10
  • Number of Outputs Field details:
    2
  • Output Cord Gauge (AWG) Field details:
    1
  • Single Phase or Three Phase Field details:
    Three Phase
  • Product Configuration Field details:
    Distributed Product Configuration
  • Maximum Available Output Power Field details:
    200000.0
  • Maximum Output Power Field details:
    200.0

Efficiency

  • Idle Mode Input Power (watts) AC- Input Field details:
    118.98
  • No Vehicle Mode Input Power (watts) AC-Input Field details:
    13.94
  • No Vehicle Mode Power Factor AC-Input Field details:
    0.01
  • No Vehicle Mode Total Allowance (watts) Field details:
    134.32
  • Partial On Mode Input Power (watts) AC-Input Field details:
    14.23
  • Partial On Mode Power Factor AC-Input Field details:
    0.01
  • Partial On Mode Total Allowance (watts) Field details:
    134.32
  • Average Loading-Adjusted Efficiency (%) AC-Input Field details:
    0.96

Features

  • Automatic Brightness Control Capable? Field details:
    No
  • Connected Capable Field details:
    Yes
  • Connects Using Field details:
    Wi-Fi,Wired Ethernet
  • Network Connection Types Available Field details:
    Gigabit Ethernet,Wi-Fi,Other LAN (Local Area Network),Cellular
  • Connector Type Field details:
    Combined Charging System (CCS)
  • DR Protocol Field details:
    Open Charge Point Protocol (OCPP)
  • Is Broadband Internet Connection Needed for Demand Response? Field details:
    No
  • Network Security Standards Field details:
    NIST Cybersecurity Framework
  • Protocols Used to Support Smart Charging Field details:
    SAE J1772
  • Integral Battery Bank Field details:
    No
  • Product Features Field details:
    None
  • ENERGY STAR Certified Field details:
    Yes

Market

  • Date Certified Field details:
    01/13/2023
  • Date Available On Market Field details:
    05/16/2024
  • Markets Field details:
    United States, Canada

Additional Model Identification

ENERGY STAR Unique IDField details: 3542830
Additional Model Names and/or Numbers: CS-240-PM