Program Requirements
For units in multifamily mid and high rise buildings to earn the ENERGY STAR, a new or substantially rehabilitated mid or high rise multifamily building must be designed to be at least 15% more energy efficient than a building built to code.
Important: EPA extended the transition to ENERGY STAR MFNC by six months, from January 1, 2021 to July 1, 2021. Multifamily projects are eligible to participate in the MFHR program if they have a permit application date before July 1, 2021. Projects that will be certified through the MFHR program must have submitted their MFHR Project Application to a Multifamily Review Organization (MRO) before January 1, 2021.
EPA launched the ENERGY STAR Multifamily New Construction program to serve all multifamily buildings. Visit the MFNC Program Requirements page to learn more and get started.
The developer of a project participating in the program must provide an EPA-recognized MFHR Review Organization (MRO) with program specific submittals. These submittals, which must be validated by a Licensed Professional, are used to demonstrate that the program’s requirements have been met, that all prerequisites are included, and that each energy conservation measure is installed to specification. Please visit the Certification Process page for more information on how to earn the ENERGY STAR.
Building performance is as much a function of proper building management as the energy conservation measures incorporated into the structure. Therefore, after units in a building earn the ENERGY STAR, the developer/owner must commit to benchmarking the building in Portfolio Manager for a period of two years. For more information please see the Benchmarking page.
Performance vs. Prescriptive Path
There are two paths available to meet ENERGY STAR’s MFHR requirements:
- ENERGY STAR MFHR Performance Path (PDF, 376KB): An approach to meeting program requirements where software is used to model the building’s energy use to verify that it meets the Performance Target. (See notes below to determine the Performance Target in your state).
- ENERGY STAR MFHR Prescriptive Path (PDF, 197KB): An approach where a developer constructs the project using a prescribed set of construction specifications that meet program requirements. (This path is not available in all states; see notes below).
- California ENERGY STAR MFHR Performance Path (PDF, 121KB) For projects in California, EPA has modified its National Performance Path to align with the 2013 Title 24 Standards, instead of ASHRAE 90.1.
Please note that although the Performance Path allows for some trade-offs when selecting energy conservation measures for meeting the Performance Target, the program has set some minimum prerequisites for specific energy efficiency components. Although the prerequisite measures can be used to help the project meet the Performance Target, failure to meet the prerequisite requirements will result in the project not earning the ENERGY STAR. The prerequisites are found within the ENERGY STAR MFHR Performance Path document.
Both the Prescriptive Path and Performance Path require that partners comply with mandatory Testing & Verification Protocols available on the Guidance Documents page. All program documentation for both paths is available for download in a .zip file for convenience.
Performance Targets in States enforcing 2012 or 2015 IECC
To ensure that ENERGY STAR remains a mark of distinction and provides meaningful energy savings above code, MFHR projects pursuing ENERGY STAR certification in states that have adopted 2012 IECC, 2015 IECC, ASHRAE 90.1-2010 or ASHRAE 90.1-2013, will be required to meet a modified Performance Target, rather than the current national requirement of 15% over ASHRAE 90.1- 2007.
To provide a period of transition, all ENERGY STAR MFHR Project Applications submitted to EPA on or before December 31, 2014, will be allowed to meet a Performance Target of 15% savings over ASHRAE 90.1-2007, regardless of the current or future code for their state.
All Project Applications submitted on or after January 1, 2015 must pursue a Performance Target of 15% better than the energy code under which the building is permitted (unless otherwise noted below). Since EPA has not yet developed a Prescriptive Path based on these codes, only the ENERGY STAR MFHR Performance Path certification option will be available for projects in these states.
Notes and Exceptions:
- Local Code Exception: While local city or town codes may differ from the state code, the determination for the ENERGY STAR program is based on the commercial code adopted by the state, not the local jurisdiction. In an instance where the building is permitted under a local code that is not the same as the state code, the Performance Target is based on the state code in place. The permit application or issue date will be used to determine what state code was in place in the state. To determine the code adopted by the state and its effective date, please visit www.energycodes.gov. (See example 4 below.)
- State Code changes between ENERGY STAR MFHR Project Application and Permit: If the Project Application is submitted on or after January 1, 2015, and the state code changes between the ESMFHR Project Application date and the permit application date (or the reverse), the project’s Performance Target is based on the code the project is permitted to, and not based on the code in place at the time of the ESMFHR Project Application. (See examples 2 and 3 below. A copy of the permit may be requested.)
- California: For projects in California that are permitted to Title 24–2016, the performance target is defined as a Compliance Total with ≥ 10% savings above the Compliance Total of the Standard Design corresponding to the building, as determined by a CEC-approved software program, in accordance with 2016 Building Energy Efficiency Standards.
- Modeling options: To reduce the burden of applying two different codes to a given project, a Policy Record has been established that would allow 20% savings over ASHRAE 90.1-2007 as equivalent to 15% over ASHRAE 90.1-2010. The Policy Record would also accept 25% savings over ASHRAE 90.1-2007 and 20% savings over ASHRAE 90.1-2010, as equivalent alternatives to 15% savings over ASHRAE 90.1-2013.
- Appendix G version: Projects must use the Appendix G of the code corresponding to their Performance Target or Appendix G from ASHRAE 90.1-2016. Projects using Appendix G from ASHRAE 90.1-2016 must use the Performance Path Calculator_AppG2016 and Simulation Guidelines_AppG2016 available on the Guidance Documents page. Projects may not use Appendix G from ASHRAE 90.1-2016 if they are using the 20% or 25% Performance Target Options. Note: Addendum bm from ASHRAE 90.1-2013 is no longer referenced since its content and the related excerpts that followed have been incorporated into Appendix G from ASHRAE 90.1-2016.
State Code | 90.1-2007 | 90.1-2010 | 90.1-2013 | 90.1-2016 |
---|---|---|---|---|
2009 IECC | 15%* | NA | NA | NA |
2012 IECC | 20%†† | 15%* | NA | NA |
2015 IECC | 25%†† | 20%†† | 15%*† | NA |
2018 IECC | NA | NA | NA | 15% |
*Appendix G from the referenced code or ASHRAE 90.1-2016 or may be used.
† Appendix G from ASHRAE 90.1-2010 may be used for projects with Project Applications submitted prior to February 1, 2018.
†† These Performance Target options may not be used for projects using Appendix G from ASHRAE 90.1-2016.
To further demonstrate this policy, some examples are provided below. Please contact mfhr@energystar.gov if you have any questions about the Performance Target for your project.
- Example 1: An ESMFHR Project Application submitted any date prior to 1/1/2015, regardless of the commercial code in effect at the time of permit requires 15% savings over ASHRAE 90.1-2007, using the transition period exemption.
- Example 2: An ESMFHR Project Application submitted in February 2016 in a state where ASHRAE 90.1-2010 or 2012 IECC has already been adopted would require 15% savings over ASHRAE 90.1-2010, since the transition period deadline has passed. If that project was permitted while the state code was still 2009 IECC, it could meet the Performance Target of 15% over ASHRAE 90.1-2007.
- Example 3: An ESMFHR Project Application was submitted in March 2015, while the state code was ASHRAE 90.1-2007 or 2009 IECC. The project has not yet been permitted, but targets 15% savings relative to ASHRAE 90.1-2007. The project experiences delays, and the state has since adopted and is enforcing ASHRAE 90.1-2010 (or 2012 IECC). The ENERGY STAR Performance Target is based on the permit. If the project is permitted to the new code, the project must now demonstrate 15% savings relative to ASHRAE 90.1-2010.
- Example 4: An ESMFHR Project Application submitted in July 2015 in a state where the state code is 2012 IECC, but the local code is still 2009 IECC or based on 2009 IECC (ex. stretch code). ENERGY STAR would require 15% savings over ASHRAE 90.1-2010, since the determination is based on the state code, not the local code. This applies even if the local code is more advanced than the current state code (ex. stretch code).
Policy Changes and Clarifications
EPA periodically revises the MFHR Program Requirements in response to partner questions and evolving standards (e.g., ENERGY STAR product specifications, NAECA standards, model energy codes). The purpose of this revision process is to be responsive to partner questions, to disseminate policy changes in a consistent manner, and to adapt the program as needed for success. Revisions will be made on an as needed basis; however, it is expected that the guidelines will not be updated more frequently than every six months.
- Current Policy Record (PDF, 1.1 MB) – This document contains policy issues that were received and have been resolved since the last revision of the program documents, sometimes resulting in modifications that will be incorporated into the next version of the program documents. It also contains unresolved issues pending resolution by EPA. This document was last updated on May 21, 2024. Licensed Professionals should review this document for clarifications and updates to the Program Requirements.
FAQs
Please reference the MFHR FAQ page for answers to the questions most frequently asked by MFHR program participants. While these answers may also appear in our Policy Record, the most common questions and answers have been placed in the FAQ system for your convenience and are organized by categories (ie. Appliances, Lighting, T&V).
Revisions to Program Documents
- Performance Path Revision 03 Tracking Document (PDF, 202 KB) – This document is a redlined version that shows the edits between Rev02 and Rev03.
- Prescriptive Path Revision 03 Tracking Document (PDF, 202 KB) – This document is a redlined version that shows the edits between Rev02 and Rev03.
- Revision 02 Highlights Document (PDF, 134 KB) – This document is a summary of the MFHR Rev02 edits, released on September 30th, 2013.
- Performance Path Revision 02 Tracking Document (PDF, 171 KB) – This document is a redlined version that shows the edits between Rev01 and Rev02.
- Prescriptive Path Revision 02 Tracking Document (PDF, 278 KB) (PDF, 278KB) – This document is a redlined version that shows the edits between Rev01 and Rev02.
- Testing and Verification Protocols Revision 02 Tracking Document (PDF, 621 KB) – This document is a redlined version that shows the edits between Rev01 and Rev02.
- Simulation Guidelines Revision 02 Tracking Document (PDF, 406 KB) – This document is a redlined version that shows the edits between Rev01 and Rev02.