Tabb Middle School
300 Yorktown Road
Yorktown, VA 23693
Map It!
Tabb Middle School was the first school building in the York County School Division (YCSD) to have a geothermal heating and air-conditioning system installed. The school was originally built in 1967 and received a complete renovation in 2000. A classroom wing, a new media center, and an auxiliary gym were added to the original structure, increasing the total square footage to 96,284.
The renovation design centered on the educational environment and incorporated many high performance sustainable building features, including:
In 2003, occupancy sensors were installed in classrooms to turn off the lights when rooms are unoccupied. These sensors also signal the building automation system to reset room temperature setpoints when no one is in the rooms.
Communications:
In 2006, Tabb Middle School had the distinguished honor of being the first middle school building in Virginia to earn the ENERGY STAR. Many representatives from other school systems, architects, and professional engineers have toured this facility to observe the implementation of high-performance, sustainable building technology. YCSD also participates in various Earth Day activities and EPA's ENERGY STAR Change a Light campaign.
Testimonial:
Today, Tabb Middle School students and staff enjoy a totally renovated school building with better indoor air quality and an outstanding teaching environment. The maintenance staff is very pleased with the reliability of the geothermal equipment, and the school board is excited about the utility savings associated with geothermal heating and air-conditioning.
Please note: Narrative information in this profile has been provided by York County School Division or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Building Owner:*
York County School Division
Property Manager:*
N/A
Year(s) Labeled (Rating):
2006 (75)
2009 (81)
2010 (83)
2011 (82)
2012 (83)
2014 (82)
Facility Type: K-12 School
Total Floorspace: 93211 sf
Year Constructed: 1967
Contract Type: Single Turn-Key Contract
Financing Type: Public Bond
Technologies Used:
| Stage 2-Lighting |
| Stage 3-Load Reductions |
| Stage 4-Fan Systems |
| Stage 5-Heating and Cooling Plant |
| Other Technologies/Strategies |