31st Medical Group
31st Fighter Wing
Milan, TT 60707-0000
Map It!
Since the hospital opened in July 2006, many opportunities to implement energy savings initiatives have been identified in construction/renovation as well as maintenance and repair.
To reduce energy use, the Aviano Hospital executed both no-cost and energy-savings projects. No-cost energy-saving initiatives included the following:
-- Monitoring/de-lamping interior illumination
-- Raising the chilled water set point
-- Upgrading direct digital control (DDC) software
-- Setting back admin air handling unit
-- Changing indoor temperature
-- Installing light sensors in restrooms
Energy-savings projects included:
-- Replacing air handling units as part of free cooling system
-- In-house spot cooling
Communications:
Unavailable
Testimonial:
"Aviano is the first U.S. maintained site on foreign soil to achieve the ENERGY STAR."
-- David Christiansen, Director of Engineering, AFMSA
Please note: Narrative information in this profile has been provided by AFMSA or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Federal Building
Building Owner:*
AFMSA
Property Manager:*
AFMSA
Year(s) Labeled (Rating):
2009 (76)
2010 (81)
2012 (90)
2013 (89)
Facility Type: Hospital (General Medical & Surgical)
Total Floorspace: 129819 sf
Year Constructed: 2006
Contract Type: Internal Resources
Technologies Used:
| Stage 1-Recommissioning |
| Stage 2-Lighting |
| Stage 3-Load Reductions |
| Stage 4-Fan Systems |
| Stage 5-Heating and Cooling Plant |