Return to ENERGY STAR.gov
Find More Facilities
ENERGY STAR Labeled Buildings & Plants
Facility Profile ENERGY STAR Logo

ENERGY STAR Labeled Building Profile

Tri-Cities HS
2575 Harris ST
East Point, GA 30344
Map It!

building

Tri-Cities High School opened in 1988 with approximately 70 classrooms and has expanded to approximately 100 classrooms in the main building. The building’s mechanical design utilizes water source heat pumps for classroom areas, and gas heat and air cooled roof top units for assembly and office areas. The school has a direct digital control building automation system and is located on a 34-acre campus in the city of East Point. In 2013, the roof was replaced with a highly reflective roof system, and a heating, ventilating, and air conditioning (HVAC) system replacement project was completed in 2014. Outside air pretreatment was upgraded, boilers were converted to high efficiency condensing type, and the water source heat pump condenser water system was converted to variable volume pumping. Additionally, most of the exterior lighting was converted to LED fixtures.

The Tri-Cities High School Performing Arts Building was constructed in 2009 to improve facility support for the Tri-Cities Performing Arts Magnet Program. It has space for band, orchestra, chorus, and dance programs. It is a brick faced building that matches the adjacent main building for Tri-Cities High School. It is served by natural gas heated and air-cooled electric roof top units.

Communications:

Unavailable

Testimonial:

Unavailable


Please note: Narrative information in this profile has been provided by Fulton County Schools or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.

Building Owner:*
Fulton County Schools

Property Manager:*
N/A

Year(s) Labeled (Rating):
2010 (79)
2011 (79)
2013 (86)
2014 (86)
2015 (92)
2016 (91)
2017 (93)

Facility Type: K-12 School

Total Floorspace: 285268 sf

Year Constructed: 1990

Contract Type: None

Technologies Used:
   Stage 1-Recommissioning
   Stage 2-Lighting
   Stage 4-Fan Systems
   Stage 5-Heating and Cooling Plant
   Other Technologies/Strategies