AON Hewitt Orlando
2300Discovery Drive
Orlando, FL 32826
Map It!
A few of the energy efficiency measures incorporated into the Hewitt building were: a building automated control system (BAS) with direct digital controls (DDC) controls for the HVAC and lighting; motion detectors for the majority of work space lighting; a heat wheel system that pre-heats/cools fresh air using the exhaust air; and variable frequency drives (VFDs) on all air handler units.
Energy performance upgrades since 2004 include:
In addition to these upgrades, adding VFDs to chillers, BAS upgrades, and more aggressive reduced run times in 2007 showed a savings of $50,000 over the same period of time from 2006. The addition of VFDs to cooling towers along with a new tower water temperature reset and more BAS upgrades in 2008 have made it possible to increase the building's energy performance rating to the top 25 percent in the nation, earning the Hewitt Associates building the ENERGY STAR for superior energy performance.
Communications:
Postings outlining energy initiatives and the ENERGY STAR Award will be placed on The Source, Hewitt's internal Web site, One Source, Jones Lang LaSalle's internal Web site, and the local chapter of BOMA. The plaque will be displayed in the client entrance to the building.
Testimonial:
"The property staff is not resting on the fact we have an efficient building; we are always looking for new ways to reduce energy and costs. More BAS upgrades, adjustments to HVAC run times and set points, vending machine occupied sensors, parking lot lights upgrades, Associate education, and other energy saving devices are always being considered and budgeted for."
-- John Held, Chief Engineer, Jones Lang LaSallePlease note: Narrative information in this profile has been provided by Aon Hewitt or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Building Owner:*
Aon Hewitt
Property Manager:*
N/A
Year(s) Labeled (Rating):
2008 (84)
2009 (91)
2010 (90)
2012 (95)
2013 (95)
2014 (91)
2015 (91)
2016 (90)
Facility Type: Office
Total Floorspace: 364241 sf
Year Constructed: 1999
Contract Type: None
Technologies Used:
| Stage 1-Recommissioning |
| Stage 2-Lighting |
| Stage 4-Fan Systems |
| Stage 5-Heating and Cooling Plant |