RICHEY ES
105 E. Highland Ave.
Wlimington, DE 19804
Map It!
The education offered at
Renovations for Richey Elementary School included the following items: 1) construction of additional classrooms, a gym, and a multipurpose room, as well as an upgrade to the library facility; 2) renovations to the heating, ventilation, and air-conditioning systems; 3) electrical renovations to support new technological, environmental, and safety systems; 4) plumbing and fire sprinkler upgrades to meet current codes; and 5) repair or replacement of doors, the roof, and ceilings, as well as other miscellaneous improvements. .
ENERGY STAR Guidelines for Energy Management were followed throughout the design and purchasing for these major capital projects. Data compiled through Portfolio Manager and its subsequent reports help the school ensure that these improvements maximize the use of its energy resources.
Communications:
Testimonial:
"As the Principal of Richey Elementary, I am proud and pleased to accept this award on behalf of our school community. The staff and students work hard on a daily basis to conserve energy. Turning off lights when we leave the room and closing classroom doors has become second nature for all of us."
-- Dorothy Johnson, Principal, Richey Elementary School
Please note: Narrative information in this profile has been provided by Red Clay Consolidated School District or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Service Provider:
Studio JAED Architects & Engineers
Building Owner:*
Red Clay Consolidated School District
Property Manager:*
N/A
Year(s) Labeled (Rating):
2008 (75)
2010 (92)
2011 (86)
2012 (86)
2013 (83)
2015 (89)
Facility Type: K-12 School
Total Floorspace: 58598 sf
Year Constructed: 1965
Contract Type: Multiple Vendor Contracts
Financing Type: Public Bond
Technologies Used:
| Stage 1-Recommissioning |
| Stage 2-Lighting |
| Stage 3-Load Reductions |
| Stage 5-Heating and Cooling Plant |
| Other Technologies/Strategies |