HERITAGE ES
2815 Highlands Ln.
Wlimington, DE 19808
Map It!
At
The district, an ENERGY STAR partner since 2007, invested 4.5 million dollars in renovations. Three areas were targeted for improvement: 1) repairs to existing heating, ventilation, and air-conditioning systems; 2) construction of additional classrooms and complete upgrades to library and lavatory facilities; and 3) upgrades to interior doors and finishes, replacement of plumbing fixtures, and additional miscellaneous needs.
ENERGY STAR Guidelines for Energy Management were followed throughout the design and procurement of these major capital projects. As a result, the school earned the ENERGY STAR in 2008 for superior energy efficiency. Data compiled through Portfolio Manager help school officials ensure that these improvements maximize the use of their energy resources
Communications:
Testimonial:
This year, Heritage Elementary earned the ENERGY STAR because we met the 75th or higher percentile rating for energy efficiency in our building. This award is the direct result of our student and staff's efforts to cut down on energy consumption by closing doors, shutting off lights and computers, and conserving water. Congratulations to the Heritage students and staff for being conscientious consumers of energy in our building!
Please note: Narrative information in this profile has been provided by Red Clay Consolidated School District or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Service Provider:
Studio JAED Architects & Engineers
Building Owner:*
Red Clay Consolidated School District
Property Manager:*
N/A
Year(s) Labeled (Rating):
2008 (76)
2009 (92)
2010 (92)
2011 (88)
2012 (93)
2013 (91)
2014 (92)
Facility Type: K-12 School
Total Floorspace: 68880 sf
Year Constructed: 1966
Contract Type: Multiple Vendor Contracts
Financing Type: Public Bond
Technologies Used:
| Stage 1-Recommissioning |
| Stage 2-Lighting |
| Stage 3-Load Reductions |
| Stage 4-Fan Systems |
| Stage 5-Heating and Cooling Plant |
| Other Technologies/Strategies |