The Main Street Building
100 Main Street
Anytown, US 01234
Map It!
The Main Building in downtown Anytown, USA is a 12-story
commercial office building whose tenants include, among others,
doctors' practices, corporate offices, and administrative workspaces.
The building, constructed in 1995, is owned by ABC Properties Fund and
managed by DEF Property Management. Recognizing the potential to
improve The Main Building's energy and financial performance, DEF
turned to the proven strategy of EPA's ENERGY STAR program in 2002
for the tools and resources necessary to help achieve superior energy
performance.
By working with ENERGY STAR to make The Main Building more energy
efficient, DEF Property Management is saving the building's owners
about $50,000 per year in energy costs.
As a first step, the DEF energy management team sought to assess The
Main Building's baseline energy performance and to pursue the
efficiency gains that could be accomplished through improved operations
and maintenance and other low-cost practices. Initial benchmarking in
2002 using the ENERGY STAR Portfolio Manager tool returned a baseline
rating of 63 — above the national average, but still not high
enough
to earn the ENERGY STAR label. The team was able to leverage utility
incentives in order to conduct a whole building retro-commissioning
survey — a process that revealed a number of significant (but
simple)
operational changes that resulted in rapid savings. For instance, the
team reviewed the property's EMS settings in order to ensure that the
building automation reflected the actual needs of the tenants. Through
this process, it was discovered that the building's HVAC systems were
being turned on for five hours each Saturday, even though the tenant
that had originally requested this service had long since moved out of
the building! A simple re-programming of the system eliminated the
unneeded energy consumption, resulting in an immediate whole-building
energy reduction of 2% in 2003. Furthermore, the implementation of a
regular preventive maintenance program (including HVAC filter
replacement, optimized HVAC scheduling, damper adjustment, and seasonal
thermostat recalibration), is expected to save an additional 7-10% in
annual energy consumption as compared to "business as usual" —
all while taking place within the context of the building staff's
regular O&M responsibilities.
Based on the cost savings realized through the retro-commissioning
process, DEF was able to obtain ABC's approval to undertake a whole
-building lighting retrofit. This process involved the replacement of
T-12 fluorescent tubes with more energy-efficient T-8s, and the
installation of electronic ballasts in place of the older magnetic
ballasts. In addition, occupancy sensors were installed in common areas
and all private offices. Bundled together, these lighting measures
resulted in whole building energy savings of 10%, and the retrofit will
pay itself back within 3 years. Furthermore, to reduce building heat
gain from direct sunlight, window films were installed on the south and
west sides of the building.
In addition to the direct energy savings that have been realized at The
Main Building, the property's cooling load was also reduced
significantly. In fact, when it came time to replace the chillers in
2005, it was realized that smaller units would be sufficient to meet
the building's reduced cooling needs. In addition to the reduced
first cost of this upgrade, the installation of high-efficiency
chillers, variable speed drives on pumps and fans, and premium
efficiency motors will help the building to achieve continuously high
energy performance.
In 2004, only two years after its initial benchmarking, The Main
Building earned the ENERGY STAR by achieving a 76 baseline rating in
Portfolio Manager. In 2005 and 2006, the building scored an 84 and 89
respectively. This dramatic increase in energy efficiency translates
into real savings for The Main Building's owners: In the past five
years, the ABC Properties Fund has saved about $250,000 in energy
costs. The company is already reinvesting those dollars in improvements
to The Main Building's infrastructure to ensure continued high energy
performance and maximum tenant comfort.
The Main Building's owners and managers are also reaching out to
employees and tenants in order to spread the word that energy
efficiency is good for the bottom line as well as good for the
environment. Each year, ABC Properties Fund and DEF Property Management
hold an environmental fair at The Main Building for company employees
and building tenants. The event features dozens of demonstrations on
being more environmentally responsible at home and at work.
Communications:
In 2007, our energy awareness activities included Earth Day activities for employees and community members; an Energy Awareness Month building tour by city and county government officials to see the various energy upgrades that had implemented. The mayor is preparing to display the ENERGY STAR plaque in the building's lobby.
Testimonial:
"We continually strive to find new ways to reduce energy use by either replacing inefficient equipment or finding ways for existing equipment to run more efficiently. Through monthly monitoring, reporting and comparisons to historical energy data, we strive to ensure that The Main Building runs at high efficiency and is eligible to earn the ENERGY STAR each year." -- Joe Energy, Director of Facility Services, DEF Property Management
Please note: Narrative information in this profile has been provided by Arden Realty, Inc. or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Building Owner:*
ABC Properties Fund
Property Manager:*
DEF Property Management
Year(s) Labeled (Rating):
2004 (76)
2005 (84)
2006 (89)
Facility Type:
Office
Total Floorspace:
100,000 sf
Year Constructed:
1995
Contract Type:
Internal Resources
Technologies Used:
| Stage 1 — Recommissioning |
| Stage 2 — Lighting |
| Stage 3 — Load Reductions |
| Stage 4 — Fan Systems |
| Stage 5 — Heating and Cooling Plant |
For More Info:
Joe Energy
Anytown, USA 01234
555-511-1212
energy1@anytown.org