Omaha World-Herald Building
1314 Douglas Street
Omaha, NE 68102
Map It!
The Omaha World-Herald building earned the ENERGY STAR for superior energy performance by completing a series of retrofits and energy efficiency projects, including:
AHU and Pump Control upgrades
� Installed two CCSM Pump Flow Stations on both chilled water secondary pumps.
� Installed two CCSM Pump Flow Stations on both condenser water pumps.
� Installed two CCSM Fan Airflow Stations on the supply and return fans of air handling unit (AHU)-1.
� Installed two CCSM Fan Airflow Stations on the supply and return fans of AHU-2, 3, 4, and 6.
� Installed one CCSM Fan Airflow Station on the supply fan of AHU-7.
Continuous CommissioningSM Services
Chiller plant
� Developed CCSM Pump Flow Stations for the chilled water secondary pumps and the condenser water pumps.
� Integrated the chilled water secondary pump speed and supply water temperature control using CCSM Pump Flow Stations.
� Optimized the condensing water temperature control.
� Optimized the chiller enable schedule.
Boiler plant
� Optimized the hot water temperature and pump speed control.
AHU systems
� Optimized outside air intake control.
� Optimized the supply fan speed control for seven AHUs.
� Developed CCSM Fan Airflow Stations on AHU-1, 2, 3, 4, and 6 to control return fan speed and building pressure.
� Developed and implemented return fan speed and relief damper control program to improve the building pressure control for AHU-1, 2, 3, 4, and 6 using CCSM Fan Airflow Stations.
� Optimized the supply air temperature set point for all seven AHUs.
� Optimized operation schedule for seven AHUs during unoccupied time.
� Calibrated sensors as necessary.
Terminal Boxes
� Fine-tuned all single duct terminal boxes as necessary.
General
� Provided ongoing training to the building engineers during the CCSM process.
� Provided a CCSM operation manual to the building engineer and control vendor.
Communications:
Unavailable
Testimonial:
Unavailable
Please note: Narrative information in this profile has been provided by Omaha World-Herald or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Service Provider:
Grubb & Ellis|Pacific Realty
Building Owner:*
Omaha World-Herald
Property Manager:*
Grubb & Ellis|Pacific Realty
Year(s) Labeled (Rating):
2010 (97)
2009 (89)
Facility Type: Office
Total Floorspace: 507446 sf
Year Constructed: 1980
Contract Type: Single Turn-Key Contract
Financing Type: Guaranteed Savings
Technologies Used:
| Stage 1-Recommissioning |
| Stage 2-Lighting |
| Stage 3-Load Reductions |
| Stage 4-Fan Systems |
| Stage 5-Heating and Cooling Plant |
For More Info:
Shannon Yates
Sr. Vice President - Management Services
Omaha,
NE
68106
402-763-1720
SYates@gepacificrealty.com