Return to ENERGY STAR.gov
Find More Facilities
ENERGY STAR Labeled Buildings & Plants
Facility Profile ENERGY STAR Logo

ENERGY STAR Labeled Building Profile

350 California Street
350 California St.
San Francisco, CA 94104
Map It!

building

Built in 1977, 350 California is a 24-story office building located in the heart of San Francisco’s Financial District. Energy efficiency was not a consideration when 350 California was originally constructed, but the building’s owner (Union Bank) and the onsite CBRE engineering team have been diligent in creating opportunities to save energy. Improvements include:

 

-- Upgrading the fan and boiler systems

-- Replacing the antiquated vane axial fans with highly efficient fan wall units

-- Upgrading old boilers to 90-percent efficient condensing boilers

-- Replacing a chiller plant

 

350 California first earned the ENERGY STAR in 2000 and has received the recognition in the last five consecutive years.

Communications:

Unavailable

Testimonial:

Unavailable

--


Please note: Narrative information in this profile has been provided by Union Bank or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.

Building Owner:*
Union Bank

Property Manager:*
CBRE for the Union Bank

Year(s) Labeled (Rating):
2012 (85)
2011 (87)
2010 (86)
2009 (87)
2008 (90)
2007 (87)
2000 (80)

Facility Type: Bank/Financial Institution

Total Floorspace: 348500 sf

Year Constructed: 1977

Contract Type: Multiple Contractor Contracts
Financing Type: Internal Capital

Technologies Used:
   Stage 1-Recommissioning
    + Adjust Dampers
    + Air Systems Tune-up (including Ventilation)
    + Boiler Tune-up
    + Calibrate Thermostats
    + DHW Controls
    + EMS Audit
    + Employee/Tenant Energy Education Program
   Stage 2-Lighting
    + Compact Fluorescents
    + LED Exit Signs
    + LED Task Lighting
    + Occupancy Sensors
    + Reflectors
    + T8 or T5 Lamps
   Stage 3-Load Reductions
    + Control Ventilation Rates
    + New EMS
    + Window Film
    + Window Shading
   Stage 4-Fan Systems
    + Demand Ventilation
    + Fan Rightsizing
    + Improved Fan Controls
    + Install Programmable Thermostats
    + Premium Efficiency Motors
   Stage 5-Heating and Cooling Plant
    + Dedicated Systems
    + Economizer Cooling
    + High Efficiency Boilers
    + Modular Boilers

For More Info:
George Murphy
Chief Engineer
San Francisco, CA 94104
415-434-2169
George.Murphy@UnionBank.com