Return to ENERGY STAR.gov
Find More Facilities
ENERGY STAR Labeled Buildings & Plants
Facility Profile ENERGY STAR Logo

ENERGY STAR Labeled Building Profile

Boise BLM - Phase 2
1249 S. Vinnell Way
Boise, ID 83709
Map It!

building

Located in Boise, Idaho, Boise BLM has experienced many energy-saving upgrades which have helped the building earn ENERGY STAR certification. The facility?s management team implemented a lighting retrofit and set rooftop make-up air units to a set point of 55 degrees. The team identified five 24-hour rooftop exhaust fans and installed time clocks to regulate and reduce electric usage. The facility also has an up-to-date HVAC direct digital control system to control heating, cooling, and the related central plant. This system orchestrates the morning start-up of all 53 heat pumps so they don't turn on at the same time, thus reducing the facility?s demand load. Lastly, building management has prohibited the use of portable electric heaters, a rule which is strictly enforced.

Communications:

Unavailable

Testimonial:

Unavailable

--


Please note: Narrative information in this profile has been provided by Rubicon GSA II Boise INS, LLC or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.

Service Provider:
Engineering Consultants, Inc.

Federal Building

Building Owner:*
Rubicon GSA II Boise INS, LLC

Property Manager:*
Rubicon GSA II Boise INS, LLC

Year(s) Labeled (Rating):
2012 (76)

Facility Type: Office

Total Floorspace: 60280 sf

Year Constructed: 1997

Contract Type: Single Turn-Key Contract

Technologies Used:
   Stage 1-Recommissioning
   Stage 2-Lighting
   Stage 4-Fan Systems

For More Info:
Cathy Miller
Boise, ID 83705
208-376-9820
cathym@eciboise.com