Lockheed Martin SLRC Admin Tower Bldg M-151
5600 Sandlake Rd.
Orlando, FL 32819
Map It!
On April 13, 1999, Lockheed Martin Electronics & Missiles' Office Tower Building in Orlando, FL, became the second building to receive the ENERGY STAR Label. Constructed in 1982, the facility was one of the company's first office buildings to be higher than two stories, and it included some of Lockheed Martin's first efforts at performance contracting and value engineering during building construction. In 1992, the Office Tower Building's lighting system was upgraded as part of EPA's Green Lights initiative, using new technology that included installation of automatic timed lighting controls with motion sensors in conference rooms and offices.
Operation of the building's mechanical systems was recently altered, and control moved from a stand-alone concept to a part of Lockheed Martin's Energy Management control system, provided by Seimens Building Technologies. At the same time, the constant volume chilled water pumping system was converted to a primary-secondary system with variable volume pumping. This improvement was part of Lockheed Martin's aggressive energy conservation initiatives. These initiatives include installation of a $13 million Central Energy Chiller Plant, in partnership with Orlando Utilities Commission and S.I. Goldman, to serve the overall plant site. The Chiller Plant affects nine buildings and has enabled the company to decommission more than 7,800 tons of direct expansion capacity.
Having obtained recognition for the Electronics & Missiles' Office Tower Building, Lockheed Martin is anxiously awaiting the incorporation of additional building space types into the ENERGY STAR Portfolio Manager to obtain recognition for the energy performance of the entire site.
Communications:
Unavailable
Testimonial:
Unavailable
Please note: Narrative information in this profile has been provided by Lockheed Martin MFC or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Building Owner:*
Lockheed Martin MFC
Property Manager:*
Lockheed Martin MFC
Year(s) Labeled (Rating):
2011 (87)
1999 (85)
Facility Type: Office
Total Floorspace: 173826 sf
Year Constructed: 1982
Contract Type: None
Technologies Used:
Unavailable
For More Info:
Bruce Grenier
Manager, Facilities Plant Engineering
Orlando,
FL
32819
407-356-9056
bruce.grenier@lmco.com