Return to ENERGY STAR.gov
Find More Facilities
ENERGY STAR Labeled Buildings & Plants
Facility Profile ENERGY STAR Logo

ENERGY STAR Labeled Building Profile

Pearl S Buck Elementary
143 Top Road
Levittown, PA 19056
Map It!

building

Pearl S. Buck Elementary is a two-story, 63,550-square-foot building located on a 15-acre site. The original building has had no additions since it was constructed in 1969.

Projects to improve energy efficiency took place over a period of several years as lighting systems were completely replaced with T-8 and compact fluorescent light bulbs (CFLs). Exit signs were also retrofitted with energy-efficient LEDs. Boilers and efficient pumps replaced the original equipment, which was converted from steam to hydronic. The absorption/steam air conditioning system, which required the boilers to run during summer months along with a cooling tower, was replaced with a modern Trane air-cooled chiller. In addition, a roof replacement project included extra insulation and white gravel for reflection.

Continuing efforts include replacing air handler motors with premium, efficient models, as well as cog belts and all accessories. The energy management team also conducts routine system tune ups to maintain efficiencies.

Communications:

Unavailable

Testimonial:

Unavailable


Please note: Narrative information in this profile has been provided by Neshaminy School District or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.

Building Owner:*
Neshaminy School District

Property Manager:*
Neshaminy School District

Year(s) Labeled (Rating):
2009 (90)

Facility Type: K-12 School

Total Floorspace: 63550 sf

Year Constructed: 1968

Contract Type: Multiple Contractor Contracts

Technologies Used:
   Stage 1-Recommissioning
    + DHW Controls
    + New or Revised EE Maintenance Practices
   Stage 2-Lighting
    + Compact Fluorescents
    + Electronic Ballasts
    + LED Exit Signs
    + Planned Lighting Maintenance Program
    + T8 or T5 Lamps
   Stage 3-Load Reductions
    + Upgrade Roof Insulation
   Stage 5-Heating and Cooling Plant
    + Chilled Water Loop Temperature Control
    + Economizer Cooling
    + Evaporative Cooling
    + High Efficiency Boilers
    + High Efficiency Chillers
    + Hot Water Loop Temperature Control
    + Variable Frequency Drives for Fans, Pumps, and/or Cooling Towers
   Other Technologies/Strategies
    + Dual Fuel
    + High Efficiency Tank Water Heater

For More Info:
Gene Shillingford
Facilities Supervisor
Langhorne, PA 19047
215-809-6252
gshillingford@neshaminy.k12.pa.us