Bethlehem Central Middle School
332 Kenwood Ave
Delmar, NY 12054
Map It!
The largest improvement to the physical plant of the school came with a $24 million bond project that was completed in 2007. A new 2-story classroom wing, a gym, and an expanded cafeteria were added to the existing structure, increasing the floor area by 32 percent to slightly over 280,000 square feet. The newly-renovated rooms include occupancy sensors and switches for three possible levels of light intensity. Hallways were wired with the capability for half-lighting on bright days and after hours. A state-of-the-art boiler plant was added, while the entire electrical system was upgraded. A centrally-controlled, web-based energy management system was installed for the middle school and all 10 other district facilities. This system allows for greater control during both occupied and unoccupied periods. The new hydronic heating system was designed with numerous zones for better control. The energy management system (EMS) tracks room temperatures and automatically adjusts heating to outside and inside air temperatures. Improvements in heating efficiency have yielded savings of almost $118,000 in a pre- to post-construction, year-to-year comparison, with a 48-percent reduction in heating cost.
Along with improving the physical plant, the district analyzed all procedures dealing with energy consumption.
Communications:
Bethlehem
Testimonial:
“
Please note: Narrative information in this profile has been provided by Bethlehem Central School District or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.
Service Provider:
TRC Energy Services
Building Owner:*
Bethlehem Central School District
Property Manager:*
Bethlehem Central School District
Year(s) Labeled (Rating):
2010 (78)
2009 (76)
Facility Type: K-12 School
Total Floorspace: 280037 sf
Year Constructed: 1932
Contract Type: None
Technologies Used:
| Stage 1-Recommissioning |
| Stage 2-Lighting |
For More Info:
Paul O'Reilly
Energy Manager
Delmar,
NY
12054
518-439-7481