Return to ENERGY STAR.gov
Find More Facilities
ENERGY STAR Labeled Buildings & Plants
Facility Profile ENERGY STAR Logo

ENERGY STAR Labeled Building Profile

MEADOWOOD SCHOOL
55 S. Meadowood Dr.
Newark, DE 19711
Map It!

building

Meadowood School has provided its local community with an excellent educational environment for the past 35 years.  Its district, Red Clay Consolidated School District, has recently completed a comprehensive strategic planning process to ensure that all its schools can continue to provide excellence in education for years to come.  With school staff and the community, the district evaluated existing building conditions and future educational needs and determined that renovations were necessary for Meadowood School.

The total investment for the Meadowood School facility enhancements was 2.5 million dollars.  Renovation and addition work was concentrated in the following areas:  1) upgraded electrical power wiring, site lighting, and security systems; 2) replacement of existing heating, ventilation, and air-conditioning systems building-wide; 3) construction of new electrical room and multipurpose shower facility; 4) installation of a new sprinkler system; and 5) replacement of all plumbing fixtures and accessories. 

An ENERGY STAR partner since 2007, the district followed ENERGY STAR Guidelines for Energy Management throughout the design and purchasing decisions for these major capital projects.  Data compiled through Portfolio Manager help school officials ensure that these improvements maximize the use of their energy resources.


Communications:


  • Share the "Statement of Energy Performance: Facility Summary" from Portfolio Manager with the school community.


    ?  Publish articles in the local media and school newsletter, and post information on the school's Web site.


    ?  Provide resources and data to teachers and students for use with class projects.


    ?  Present at faculty, parent, and school board meetings.

  • Testimonial:

    The Meadowood School is honored to be recognized as superior in energy management.  Thank you to all of the staff and students what have made the commitment to increase energy efficiency.  Due to their dedication, we have been able to do our part to protect the environment.
    -- Kathie Mattix, Principal, Meadowood School


    Please note: Narrative information in this profile has been provided by Red Clay Consolidated School District or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.

    Service Provider:
    Studio JAED Architects & Engineers

    Building Owner:*
    Red Clay Consolidated School District

    Property Manager:*
    Red Clay Consolidated School District

    Year(s) Labeled (Rating):
    2008 (100)
    2009 (96)
    2010 (95)

    Facility Type: K-12 School

    Total Floorspace: 24388 sf

    Year Constructed: 1966

    Contract Type: Multiple Contractor Contracts
    Financing Type: Public Bond

    Technologies Used:
       Stage 1-Recommissioning
       Stage 3-Load Reductions
       Stage 4-Fan Systems
       Stage 5-Heating and Cooling Plant
       Other Technologies/Strategies

    For More Info:
    George McDowell
    Facilities Specialist
    Wilmington, DE 19804
    302 992 5583
    george.mcdowell@redclay.k12.de.us