Return to ENERGY STAR.gov
Find More Facilities
ENERGY STAR Labeled Buildings & Plants
Facility Profile ENERGY STAR Logo

ENERGY STAR Labeled Building Profile

OHSU Center for Health and Healing
3303 SW Bond Avenue
Portland, OR 97239
Map It!

building

Built in 2006, the Oregon Health and Science University (OHSU) Center for Health and Healing is a 16-story green building housing physician practices, education and research activities, retail operations, and a health and wellness center with a gym, four-lane lap pool, therapy pool, weight training area, and day spa. Not only did the OHSU Center for Health and Healing earn the ENERGY STAR for superior energy performance, it also obtained Leadership in Energy and Environmental Design (LEED) Platinum certification for its additional green designs, making it the largest LEED Platinum building in the United States at the time of certification.  


The building's design includes such green measures as:

Communications:

Unavailable

Testimonial:

Unavailable


Please note: Narrative information in this profile has been provided by RIMCO, LLC c/o CB Richard Ellis or a representative of this facility. Other building information was verified and submitted to EPA at the time of application. Building energy performance, operating characteristics, and ownership/management may be subject to change over time.

Building Owner:*
RIMCO, LLC c/o CB Richard Ellis

Property Manager:*
RIMCO, LLC c/o CB Richard Ellis

Year(s) Labeled (Rating):
2012 (75)
2011 (75)
2010 (76)
2009 (76)
2008 (76)

Facility Type: Medical Office

Total Floorspace: 408219 sf

Year Constructed: 2006

Contract Type: Multiple Vendor Contracts

Technologies Used:
   Stage 1-Recommissioning
    + System Balancing
    + Use of PC and Monitor Power Management Software
   Stage 2-Lighting
    + Compact Fluorescents
    + Daylighting
    + Dimming Ballasts
    + Electronic Ballasts
    + LED Exit Signs
    + Occupancy Sensors
    + Perimeter Daylight Controls
    + Planned Lighting Maintenance Program
    + Reflectors
    + T8 or T5 Lamps
   Stage 3-Load Reductions
    + Cool Roof Installation
    + Heat Recovery System
    + High Performance Windows
    + Pipe Insulation
    + Solar Applications
    + Upgrade Roof Insulation
    + Upgrade Wall Insulation
    + Window Shading
   Stage 4-Fan Systems
    + Fan Rightsizing
    + Improved Fan Controls
    + Premium Efficiency Motors
   Stage 5-Heating and Cooling Plant
    + Economizer Cooling
    + High Efficiency Boilers
    + High Efficiency Chillers
    + Radiant Heating
    + Variable Frequency Drives for Fans, Pumps, and/or Cooling Towers
   Other Technologies/Strategies
    + Co-Generation
    + Submetering
    + Water Saving Toilets

For More Info:
Troy Potter
Senior Chief Operating Engineer
Portland, OR 97239
(503) 418-9964
pottert@ohsu.edu