Requirements
In order to compute the new rating, there are three inputs:
There are also two new optional attributes: UPS System Redundancy and Cooling Equipment Redundancy.
As of June 7, 2010, existing Computer Data Center spaces have been converted to the new Data Center space type. Estimates will be used for the IT energy load until it is updated with actual values by the user. The use of estimates will be permitted for the first two years of implementation (until June 2012) to allow users to get proper IT energy metering in place. After that time, IT energy metering will be required. In order to earn a rating, a Data Center space using estimates for IT energy cannot be more than 10% of the buildings floor area, per the current requirement. When actual data is entered more accurate ratings can be obtained and there is no size restriction.
The most current existing average flow entries will be valid through December 2010; however users are encouraged to begin updating the flow meter values as soon as possible, in accordance with this new functionality.
The values previously entered by users for Office and Retail attributes have not changed, however, the energy performance ratings may have changed.
If you have any questions about these changes, please contact buildings@energystar.gov.