Cambridge Engineering, Inc. and DÜRR Systems, Inc.: SPP Success Story
Last Updated: 01-22-2021
Cambridge Engineering worked with DÜRR to replace a steam boiler system with a high efficiency indirect-fired hot water boiler system to provide office heating, and an energy efficient direct-fired heating system for production areas — leading to a 23 percent reduction in natural gas consumption and improved indoor air quality.
Download the Cambridge Engineering, Inc. and DÜRR Systems, Inc.: SPP Success Story here. (PDF, 55.7 KB)Resource Type
Market Sectors