Cambridge Engineering, Inc. and DÜRR Systems, Inc.: SPP Success Story

Cambridge Engineering worked with DÜRR to replace a steam boiler system with a high efficiency indirect-fired hot water boiler system to provide office heating, and an energy efficient direct-fired heating system for production areas — leading to a 23 percent reduction in natural gas consumption and improved indoor air quality.

Resource Type: